A general periodic maintenance list that helps reduce unplanned downtime through daily, weekly, monthly and annual checks. The machine manufacturer's manual should always be taken as the basis for maintenance intervals.
Planned maintenance is the cheapest way to extend a machine's service life and reduce unplanned downtime. The list below offers a general framework; maintenance intervals and procedures should always be based on the machine manufacturer's manual. Maintenance work must be carried out by authorized personnel after the power has been switched off and the machine has been made safe. You may need to shorten the maintenance intervals depending on the machine's operating hours, the material processed (for example, raw materials containing abrasive additives) and production intensity.
Daily (start-of-shift) checks
- Are the hydraulic oil level and temperature normal?
- Are the cooling water pressure and temperature correct; is the oil cooler working?
- Is there any oil or water leakage on the machine, hoses or fittings?
- Do the safety gates and emergency stop buttons work?
- Is there anything unusual around the nozzle, heater bands and mold area?
- Are the mold protection function and the air and water connections normal?
Weekly checks
- Lubrication of the tie bars, platen slides and other lubrication points
- Condition of the heater bands, thermocouples and cable connections
- Filter clogging indicators
- Tightness of the mold clamping bolts and clamps
- Checking hoses and connection points for wear or cracks
- Cleaning of the cooling filters and the oil cooler
Monthly checks
- Condition and lubrication of the pins, bushings and linkages in the clamping unit
- Cleaning of the electrical cabinet and its ventilation filters
- Comparing hydraulic oil temperature and pressure values with the records
- Whether there is any unusual change in the mold opening and closing speeds
- Checking the feed hopper, dryer and loader connections
3-6 month checks
- Evaluating a hydraulic oil sample and determining whether the filters need replacing
- Checking electrical connections and terminal tightness
- Accuracy check of sensors and limit switches
- Checking the cooling water circuit for scale and sediment
Annual checks
- Wear measurement of the screw, barrel and check valve; check earlier if part weight fluctuates
- Replacement of hydraulic oil and filters according to the manual
- Checking platen parallelism and mold closing alignment
- Backing up the control system and updating the parameter records
- Comprehensive testing of the safety circuits and their sensors
How to build a maintenance plan
When preparing the plan, use the machine's operating hours, the number of shifts, the raw material you process and the manufacturer's recommendations together. List the checks item by item on a form, assign responsible people and record the findings with measured values. When you notice even a small deviation, do not postpone it; leaks and changes in heat and sound are often the first signs of a major failure.
Safety before maintenance
- Switch off the machine's power and lock and tag it out to prevent unauthorized operation.
- Release the pressure in the hydraulic circuit; for systems with accumulators, follow the manufacturer's procedure.
- Wear protective gloves against hot surfaces in the heater and barrel area.
- Use mold safety blocks or mechanical locks when working in the mold area.
- Never disable any safety equipment.
Symptoms and possible checkpoints
| Symptom | Where to look |
|---|---|
| Oil temperature is rising | Cooling water flow, cleanliness of the oil cooler, oil level, filter |
| Part weight fluctuates | Screw-barrel and check valve wear, material feeding, process settings |
| Heater zone does not heat up or gives an error | Heater band, thermocouple connection, fuse and relay |
| Sticking or noise while the mold closes | Lubrication, tie bars and slides, hydraulic pressure, sensors |
| Foaming or leakage in the hydraulic oil | Oil level, hoses and fittings, seals, breather |
The table is only a guide for the initial check; a definitive diagnosis requires the machine-specific manual and a service assessment.
What should be written in the maintenance record?
- Date, machine code and the person who performed the check
- The check or task performed and the measured value (oil temperature, pressure, etc.)
- The code and quantity of the part replaced
- Observations and the date of the next check
Summary table
| Interval | Focus |
|---|---|
| Daily | Level, temperature, leakage, safety |
| Weekly | Lubrication, heaters, filters, tightness of connections |
| Monthly | Clamping unit, electrical cabinet, trend comparison |
| 3-6 months | Oil analysis, electrical connections, sensors |
| Annually | Screw-barrel wear, oil and filter replacement, parallelism, safety test |
Keep maintenance records
Record every check performed, every part replaced and every value measured, with the date. Records help you respond early to faults and plan spare parts needs in advance. When a part requirement arises, you can use the spare parts checklist.